Rooftop solar for homes
Systems from 1 to 10 kW with full subsidy support. Pick the size that matches your bill.
ZGI Solar surveys, designs, installs and services rooftop solar. We also help with the subsidy paperwork, so you deal with one team from start to finish.
DCR panelsBuilt for subsidy rules
Paperwork helpNational Portal, DCR certificate
Customer appIn Hindi and English, with your plant details
Service and AMCCleaning and repair requests in the app
Enter your average monthly bill. We show the right size, number of panels, yearly saving and an indicative price.
Systems from 1 to 10 kW with full subsidy support. Pick the size that matches your bill.
Solar for lifts, lights, pumps and other common-area loads.
Cut your daytime power cost. Custom designs above 10 kW.
Keep essential loads running in a power cut with lithium battery backup.
Pre-configured kits for places where the grid is not reliable.
Cleaning, repairs and yearly maintenance, all booked from the app.
Choose a package, then a kit and a size. The price shows right here. Subsidy is shown separately for information and is never deducted from the price.
Prices are indicative rates for standard sizes and layouts. The final quotation is prepared after the site survey and stays valid for 15 days.
The subsidy comes to your bank account. We stay with you from survey to application.
Subsidy applies only to residential rooftop systems and needs DCR panels and a grid connection. The government can change amounts and rules, so we confirm the latest at the survey.
We check your roof, shade and load, and suggest the right size.
A clear quotation with kit, price and subsidy details, valid for 15 days.
Choose your payment plan and book. We get your subsidy application started.
Our team fits the structure, panels, inverter and wiring.
The system goes live after net metering, inspection and commissioning. Warranty and plant details appear in the app.
Track your subsidy. We stay with you for cleaning, repairs and AMC.
DCR panels, plus paperwork help from the National Portal application to the DCR certificate.
Kit-wise rates are on this page. Subsidy is shown separately, never mixed into the price.
Silver, Gold and Platinum packages, each with several kits from 1 to 10 kW.
Panel and inverter serial numbers, subsidy status, payments and service requests in one app.
After installation we remain available for cleaning, repairs and AMC.
Our team, our app and this website all work in both languages.
Sample screen, shown for layout only
Download the apps straight from this website. Brochures and forms are open to everyone. Your own documents show only after you log in with your mobile number and an OTP.
APK apps do not install on an iPhone. Use the web version of the Customer app and choose "Add to Home Screen" in the browser menu.
Log in with your mobile number to see and download the documents ZGI Solar keeps for you (approvals, warranty papers, quotation copies and more).
Pay at booking, material delivery and commissioning, in any one of these splits.
The advance is the total cost minus the national subsidy. The balance is paid after the subsidy is received.
It needs our approval. Eligibility is confirmed after the survey.
With a bank loan, payment follows the bank’s disbursement. We help you with the paperwork.
About 100 sq ft of shadow-free space for every 1 kW. That is roughly 300 sq ft for 3 kW and 500 sq ft for 5 kW.
No. The government credits the subsidy to your bank account after commissioning and inspection. Our quotation shows it for information only.
DCR stands for Domestic Content Requirement: solar cells and modules made in India. The central subsidy is available only with DCR panels, so our subsidy-ready kits use them.
A plain on-grid system switches off when the grid is down, for safety. A hybrid system with a battery can run selected loads. Tell us your backup needs at the survey.
On-grid feeds your home and the grid with net metering. Hybrid adds a battery for backup. Off-grid runs on batteries without the grid.
Once material reaches the site, a home installation usually takes a few days. Net meter and subsidy steps depend on the electricity department and the government portal, so timelines can vary.
Panels need regular cleaning and an occasional check. Book cleaning or a service visit from the customer app. AMC plans are available.
Yes. Choose cash in three stages, a special plan (subject to approval) or bank finance.
No. These are indicative rates for standard sizes and layouts. The final quotation follows the survey, because roof type, cable length and structure height matter. It stays valid for 15 days.
Yes. We design for society common areas, shops, offices and small industry. Contact us for above 10 kW. Subsidy rules differ by case and we explain them at the survey.
Fill in the form and WhatsApp opens with your details ready. Or simply call us.